Lynn Drywall & Plaster

Commercial Drywall Contractor in Lynn, MA

Lynn Drywall & Plaster is the commercial drywall sub for the North Shore's industrial and institutional building stock, from downtown office fit-outs and North Shore Community College classrooms to Lynnway-corridor retail, outpatient clinics, senior-care facilities, municipal buildings, and warehouse office space. We self-perform light-gauge metal-stud framing, build fire-rated UL assemblies and demising walls to their listed design number, and run ICRA containment in occupied clinics. We hold a Massachusetts Construction Supervisor License and HIC registration, carry full insurance with COIs on request, work as an EPA RRP Lead-Safe firm, and run on the GC's schedule from permit through certificate of occupancy.

Call (781) 660-1848

Commercial capabilities

  • Metal-stud (light-gauge steel) framing, self-performed
  • Fire-rated UL assemblies, shaft walls, and demising walls
  • ICRA containment and negative air for occupied healthcare spaces
  • Impact- and abuse-resistant board for schools, senior care, and corridors
  • Level 4 and Level 5 commercial finishes
  • Suspended acoustical (ACT) grid ceilings
  • Occupied-building and off-hours scheduling
  • MA CSL / HIC licensed, insured, EPA RRP Lead-Safe firm

Settings we build for

Lynn Drywall & Plaster works across the North Shore's commercial building stock, from downtown office fit-outs and North Shore Community College classrooms to Lynnway-corridor retail, outpatient clinics, senior-care facilities, municipal buildings, and warehouse office space.

What commercial drywall takes in Lynn and on the North Shore

Lynn Drywall & Plaster runs commercial drywall across an industrial-and-institutional Gateway City, downtown fit-outs, a community-college campus, outpatient clinics, and Lynnway warehouse space, where the schedule, the fire rating, and the inspection all have to land. Here is how we handle the work.

How we work as a commercial sub, not a residential contractor

Lynn Drywall & Plaster runs most of its commercial work inside occupied or fast-moving buildings, which changes how we schedule and document everything. On a tenant improvement downtown or a classroom at North Shore Community College, we plan around a lease clock or an academic calendar, work off-hours when the space is in use, and coordinate our framing and finishing with the other trades so the drywall is never the reason the job slips. We pull our scope under the general contractor’s permit or our own where the work calls for it, coordinate inspections with City of Lynn Inspectional Services under 780 CMR, and hand over the documentation the certificate of occupancy depends on. We carry a Massachusetts Construction Supervisor License and Home Improvement Contractor registration, full insurance with COIs on request, and EPA RRP Lead-Safe certification, which matters constantly in Lynn’s pre-1978 building stock.

Where we build across Lynn’s commercial stock

Lynn’s commercial base tilts industrial and institutional rather than hospital-heavy, and each setting demands something different. Downtown, we build out office and civic space around the revitalizing core, Lynn City Hall, Lynn District Court, and the North Shore Community College campus, where impact- and abuse-resistant board earns its place in high-traffic corridors and classrooms. Along the Lynnway and Route 1 industrial corridor, anchored by the GE River Works / GE Aerospace plant and its supplier base, we frame and finish office and support space inside warehouse and flex buildings, where walls run tall and separations have to be rated. In the outpatient clinics of the Lynn Community Health Center and the North Shore Medical / North Shore Physicians Group network, we work inside active patient-care space. And across the Beyond Walls arts district and the Route 1A retail corridor, we build storefront and restaurant interiors on hard opening dates.

How we build fire-rated assemblies to code

When a set of plans calls for a one- or two-hour rated partition, a shaft wall, or a demising wall, Lynn Drywall & Plaster builds it to its listed UL design number, not just close to it. That means the right Type X board, the correct number of layers, proper fastener spacing, and firestopping at the penetrations and head-of-wall, because an assembly that does not match its listing fails inspection and holds up the whole certificate of occupancy. We build to the governing sections of 780 CMR and the IBC, and we document what we installed so the inspector can sign off without a second trip. In senior-care and healthcare corridors, those rated separations do double duty with abuse-resistant board that stands up to carts and daily contact.

How we hit the finish levels commercial interiors call for

Not every commercial wall needs the same finish, and knowing where each applies keeps the budget honest and the result right. Lynn Drywall & Plaster finishes most office and back-of-house partitions to a clean Level 4, and takes lobbies, conference walls, and any surface under critical or raking light to a dead-flat Level 5 skim so the paint reads smooth. In clinics and procedure rooms we finish to a cleanable, sealed surface and run ICRA containment with negative air the whole time so dust never reaches patient areas. In schools and senior facilities we lean on impact- and abuse-resistant board behind that finish, so the wall looks sharp on day one and still looks sharp after a few years of hard use.

Frequently asked questions

Do you pull the permits, or does the GC? +

Either way. On most commercial jobs we run our drywall scope under the general contractor's permit and coordinate inspections with City of Lynn Inspectional Services; where the work calls for it, we pull our own. We hold a Massachusetts Construction Supervisor License.

Can you provide a certificate of insurance? +

Yes. We carry full liability and workers' comp coverage and provide COIs naming the GC or owner as needed before we mobilize.

Can you work in an occupied building? +

Yes. Most of our commercial work happens in occupied offices, schools, clinics, and senior facilities. We phase the work, run dust containment and negative air where needed, and schedule off-hours so operations keep running.

Do you build fire-rated assemblies to a specific UL design? +

Yes. We build one- and two-hour rated partitions, shaft walls, and demising walls to their listed UL design number with the correct board, layers, and firestopping, and we document the assembly for inspection.

Do you self-perform framing, or sub it out? +

We self-perform light-gauge metal-stud framing with our own crews, along with the drywall and finishing, which keeps the schedule and the quality under one roof.

Do you do healthcare work with infection-control requirements? +

Yes. We run ICRA containment with negative air in active clinics and finish exam and procedure rooms to a cleanable surface with abuse- and infection-control board.

Have a commercial project in Lynn?

Call and walk us through the scope. We work on the GC's schedule.

Call (781) 660-1848
Call Now